Customization: | Available |
---|---|
After-sales Service: | Engineer to Install Machine |
Warranty: | Electrical and Hydraulic 3month, Machine 1 Year |
Still deciding? Get samples of US$ 1800000/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description |
Processes | Parameter |
Mixing period | 5-6 minutes |
Pouring slurry temperature | 40-45ºC |
Cake curing time | 2.5-3.0h |
Cake curing temperature | 45~55ºC |
Cake strength after curing | 0.15~0.18MPa |
Autoclaved curing system before-after autoclave | 0.5h |
Vacuumize | 0.5h(0~-0.06MPa) |
Listing pressure | 1.5h(-0.06~1.3MPa) |
Constant pressure | 8h(1.3MPa) |
Releasing pressure | 1.5h(1.3~0MPa) |
total | 12h |
Raw Material Preparation
1.Raw materials need to be ground before being processed. In order to meet the fineness requirements of the feed, block materials such as quicklime and natural gypsum need to be crushed.
2.Grinding can give full play to the activity of the material;The ground slurry has better water retention and higher viscosity due to the dissolution of some components , which can make the slurry have proper consistency and liquidity
|
Material Batching and Pouring
1.Measure various raw materials, adjust the temperature and concentration, and feed materials to the mixing equipment in sequence according to the process requirements
2.The pouring process is one of the unique processes that distinguish aerated concrete from other concretes. The prepared raw materials are stirred to meet the specified time temperature and consistency requirements to obtain slurry, then pour into the mold.
3.Pouring and batching can be controlled separately or centrally, and different degrees of automation can be realized
|
Static Maintenance
1.The poured mold is pushed into the resting room with a conveyor chain for initial gas generation and initial setting. The room temperature is 50-70°C, and the time is 1.5-2 hours.
2.The resting process is mainly to promote the slurry to continue to complete the hardening process, so that the embryo body reaches a certain hardness for cutting
|
Cutting
The cutting process is to divide and shape the AAC body to meet the appearance and size requirements. The cutting process reflects the characteristics of air-entrained concrete, which is convenient for large-volume molding, flexible and diverse in shape and size, and large-scale mechanized production
|
Autoclaving Curing
The autoclave curing process is to perform high-pressure steam curing on the cut aerated concrete body, and complete the hydrothermal reaction of CaO-SiO2-H2O in the kettle
|
Packing
This is the last process of production, including pull out the finished products form kettle, lifting, inspection, packaging and cleaning and oiling of the bottom plate of the trolley
|
Cutting Machine Group |
Mold |
Somersault demoulding machine |
Gas block Hoist: hoist block mould and grouping |
Gas block Autoclave | Gas Slurry Pouring Mixer |
Packaging & Shipping
Our Factory |
Customer plant |
FAQ |